Skip to content
1. Error: “No Cost Estimate Found for Material MAT001” in CK11N
- Issue: Creating a cost estimate in CK11N fails with: “No cost estimate found for material MAT001 in plant 1000.”
- Cause: The material lacks a BOM (Bill of Material) or routing, or the cost estimate is not created.
- Resolution:
- Go to CS01 (Create BOM), enter material MAT001, plant 1000, and create a BOM with components.
- Go to CA01 (Create Routing), create a routing for MAT001 with operations and work centers.
- In CK11N, enter material MAT001, plant 1000, and costing variant PPC1.
- Run the cost estimate and save.
- Outcome: The cost estimate is created successfully.
2. Issue: Production Order Variance Not Calculated in KKS2
- Issue: Running variance calculation in KKS2 for production order 500001 shows no variances.
- Cause: The order is not fully confirmed or delivered, or variance keys are not assigned.
- Resolution:
- Go to CO03 (Display Production Order), enter order 500001, and check the status (e.g., REL CNF DLV).
- If not confirmed, use CO11N to confirm operations and CO15 to confirm goods receipt.
- In OKV7 (Define Variance Keys), ensure a variance key is assigned to plant 1000.
- Rerun KKS2 and check variances in KKS1.
- Outcome: Variances are calculated and displayed.
3. Error: “Costing Variant PPC1 Not Defined” in CK11N
- Issue: Running a cost estimate in CK11N fails with: “Costing variant PPC1 not defined.”
- Cause: The costing variant is not configured in the system.
- Resolution:
- Go to OKKN (Define Costing Variants), create or verify costing variant PPC1.
- Assign valuation variant, quantity structure, and date control to PPC1.
- Save and retry CK11N with costing variant PPC1.
- Outcome: The cost estimate runs with the defined costing variant.
4. Issue: Material Cost Estimate Not Released in CK24
- Issue: Marking a cost estimate in CK24 for material MAT002 does not release it to the material master.
- Cause: The cost estimate was not marked, or the release settings are incorrect.
- Resolution:
- Go to CK11N, create and save a cost estimate for material MAT002 in plant 1000.
- In CK24, enter material MAT002, plant 1000, and select “Mark Cost Estimate.”
- After marking, select “Release Cost Estimate” in CK24.
- Check the material master (MM03) under the “Costing” view for the updated standard price.
- Outcome: The cost estimate is released to the material master.
5. Error: “No Activity Type Assigned to Work Center” in CR01
- Issue: Creating a routing in CA01 fails with: “No activity type assigned to work center WC001.”
- Cause: The work center lacks an activity type for cost calculation.
- Resolution:
- Go to CR02 (Change Work Center), enter work center WC001 and plant 1000.
- In the “Costing” tab, assign an activity type (e.g., LAB001) and cost center (e.g., COST001).
- Save and retry the routing creation in CA01.
- Outcome: The routing is created with the work center.
6. Issue: Production Order Settlement Not Posting in CO88
- Issue: Running settlement in CO88 for production order 500002 does not post to the G/L.
- Cause: The order status is not TECO (Technically Complete), or the settlement rule is missing.
- Resolution:
- Go to CO02 (Change Production Order), enter order 500002, and set the status to TECO.
- Check the “Settlement Rule” tab; if missing, define a receiver (e.g., material MAT003).
- Save and execute CO88 with the test run first, then post.
- Check FBL3N for G/L postings.
- Outcome: The settlement posts to the G/L.
7. Error: “No Authorization for Transaction CK11N”
- Issue: A user cannot create a cost estimate in CK11N due to: “No authorization for transaction CK11N.”
- Cause: The user lacks the required authorization.
- Resolution:
- Run SU53 to identify the missing authorization object (e.g., C_KKR_KKR).
- Request the Basis team to update the user’s role in PFCG.
- Retest in CK11N.
- Outcome: The user can create cost estimates.
8. Issue: Cost Estimate Shows Zero Cost for Material MAT004
- Issue: A cost estimate in CK11N for material MAT004 shows zero cost despite a BOM and routing.
- Cause: The BOM components or activity rates have no prices.
- Resolution:
- Go to MM03, check the material master for MAT004’s components for standard prices.
- If missing, update prices in MR21 (e.g., $10 for component MAT005).
- In KP26 (Plan Activity Prices), set rates for the activity type (e.g., $5 per hour for LAB001).
- Rerun CK11N and verify the cost estimate.
- Outcome: The cost estimate shows the correct cost.
9. Error: “Period Not Open for Posting” in CO88
- Issue: Settling production orders in CO88 fails with: “Period 03/2025 is not open for controlling area 1000.”
- Cause: The controlling area period is closed.
- Resolution:
- Go to OKP1 (Maintain Controlling Area Periods), enter controlling area 1000.
- Open period 03/2025 for the relevant transaction (e.g., CO88).
- Save and retry CO88.
- Outcome: The settlement posts in the correct period.
10. Issue: Variance Key Not Assigned in Production Order
- Issue: Production order 500003 does not calculate variances in KKS2 due to a missing variance key.
- Cause: The variance key is not assigned to the plant or order type.
- Resolution:
- Go to OKV7 (Define Variance Keys), create or verify a variance key (e.g., VAR001).
- In SPRO, under Product Cost Controlling > Cost Object Controlling > Define Variance Keys for Plant, assign VAR001 to plant 1000.
- In CO02, enter order 500003, and assign the variance key in the “Control Data” tab.
- Rerun KKS2 and check KKS1.
- Outcome: Variances are calculated for the order.
11. Error: “No Cost Component Structure Defined” in CK11N
- Issue: Creating a cost estimate in CK11N fails with: “No cost component structure defined for costing variant PPC1.”
- Cause: The cost component structure is not assigned to the costing variant.
- Resolution:
- Go to OKTZ (Define Cost Component Structure), create or verify a structure (e.g., CCS001).
- In OKKN, assign the cost component structure CCS001 to costing variant PPC1.
- Save and retry CK11N.
- Outcome: The cost estimate includes cost components.
12. Issue: Production Order Cost Not Updated in CO03
- Issue: Costs for production order 500004 in CO03 are not updated after confirmation.
- Cause: The activity type or cost element rates are not maintained.
- Resolution:
- Go to KP26, enter the activity type (e.g., LAB001) and cost center (e.g., COST001).
- Set the rate (e.g., $5 per hour) for period 03/2025.
- In CO11N, confirm the operations for order 500004 again.
- Check CO03 for updated costs.
- Outcome: Costs are updated in the production order.
13. Error: “No Valid Receiver Found” in CO88
- Issue: Settling production order 500005 in CO88 fails with: “No valid receiver found.”
- Cause: The settlement rule is missing or the receiver is invalid.
- Resolution:
- Go to CO02, enter order 500005, and check the “Settlement Rule” tab.
- Define a receiver (e.g., material MAT006 or G/L account 400000).
- Save and rerun CO88.
- Check FBL3N for postings.
- Outcome: The settlement completes with a valid receiver.
14. Issue: Overhead Costs Not Applied in Production Order
- Issue: Overhead calculation in KGI2 does not apply costs to production order 500006.
- Cause: The overhead rate is not defined for the order or cost element.
- Resolution:
- Go to KZZ2 (Maintain Overhead Rates), enter controlling area 1000.
- Define the overhead rate (e.g., 10% of cost element 400000) for order 500006.
- Save and rerun KGI2 for period 03/2025.
- Check CO03 for the overhead posting.
- Outcome: Overhead costs are applied to the order.
15. Error: “Material MAT007 Not Valuated” in CK11N
- Issue: Creating a cost estimate in CK11N fails with: “Material MAT007 not valuated in plant 1000.”
- Cause: The material lacks a standard price in the material master.
- Resolution:
- Go to MM03, enter material MAT007, and check the “Accounting” view.
- If no price exists, use MR21 to set a standard price (e.g., $15).
- Save and retry CK11N.
- Outcome: The cost estimate completes with the valuated material.
16. Issue: Production Order Costs Reversed Unexpectedly in CO03
- Issue: Costs for production order 500007 in CO03 are reversed without user action.
- Cause: A reversal was triggered by a user or batch job (e.g., CO13 or settlement reversal).
- Resolution:
- Go to CO03, filter for the reversed document and note the reversal document number.
- Check FB03 for the reversal details (e.g., user or job).
- Reconfirm operations in CO11N if the reversal was unintended.
- Restrict reversal access if needed.
- Outcome: The costs are restored or secured.
17. Error: “No BOM Exists for Material MAT008” in CK11N
- Issue: Creating a cost estimate in CK11N fails with: “No BOM exists for material MAT008 in plant 1000.”
- Cause: The material lacks a BOM for costing.
- Resolution:
- Go to CS01, create a BOM for material MAT008 in plant 1000.
- Add components (e.g., MAT009, MAT010) and save.
- Retry CK11N with the updated BOM.
- Outcome: The cost estimate includes the BOM components.
18. Issue: WIP Not Calculated in KKAX
- Issue: Calculating WIP in KKAX for production order 500008 shows zero WIP.
- Cause: The order status is not set to REL (Released) or WIP calculation rules are missing.
- Resolution:
- Go to CO02, enter order 500008, and ensure the status is REL.
- In SPRO, under Product Cost Controlling > Cost Object Controlling > Define WIP Calculation Rules, verify settings.
- Rerun KKAX for the order and check WIP in KKAY.
- Outcome: WIP is calculated correctly.
19. Error: “No Routing Found for Material MAT009” in CK11N
- Issue: Creating a cost estimate in CK11N fails with: “No routing found for material MAT009 in plant 1000.”
- Cause: The material lacks a routing for costing.
- Resolution:
- Go to CA01, create a routing for material MAT009 in plant 1000.
- Add operations (e.g., Assembly) with work center WC002 and save.
- Retry CK11N with the updated routing.
- Outcome: The cost estimate includes the routing costs.
20. Issue: Cost Estimate Not Updated in Material Master After CK24
- Issue: Releasing a cost estimate in CK24 for material MAT010 does not update the material master price.
- Cause: The costing variant or release settings are incorrect.
- Resolution:
- Go to OKKN, verify that costing variant PPC1 allows price updates in the material master.
- In CK24, mark and release the cost estimate for MAT010 in plant 1000.
- Check MM03 under the “Costing” view for the updated standard price.
- Outcome: The material master price is updated.